I would suggest getting several estimates if you haven t done so already.
How much should you over lap metal siding.
Frank regardless of where you live you should never go over any siding especially when the existing siding is in poor condition.
Framing or one bay for 24 inch o c.
For walls longer than 12 feet you ll need to butt additional lengths of siding together.
Using existing siding for replacing siding the best place to start is to closely examine the existing siding to get a good understanding of what condition it is actually in.
You never know what could be hiding under the old siding.
If that company you mentioned gave you a lower estimate it s for the reason you stated.
Butt joints in adjacent courses should be spaced apart by at least two stud bays for 16 inch o c.
On the eave side of the roof aim to overhang the panels by 1 to 1 5 inches.
If you re installing a metal roof on a home without gutters you can overhang the panels by twice that amount.
In other words if the height of the roof drops by 2 inches for every 12 inches in length you will need to use sealant to strengthen the overlap barrier.
They are cutting corners on your job to keep costs down.
According to the best practices manual from james hardie existing siding can be used as a substrate as long as it is in good condition meaning that it is not warped.
This strip will kick out the bottom of the first lap as if it were sitting on top of another lap.