You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
How to apply flashing with a rolled roof.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
Prepare roof edges cant strips.
Visit your local hardware store and ask for enough rolled roofing to fit the area of your roof.
Roll roofing is made from the same asphalt composition material as shingles and it s easier to install.
Roll roofing is different.
How to install roll roofing on low slope roofs.
An underlayment of felt roofing is optional.
How to install polymer bituminous flashing.
Nail the roofing strips parallel to the roof edge set in 1 and 8 from the roof edge with nails spaced 4 o.
Provide 6 inches of overlap under each side of the.
There are three systems including glue down torch down and peel and stick.
To apply rolled roofing you ll need your roof measurements a broom chalk to mark lines a razor blade to cut the material roofing cement nails and a hammer to hold down the material.
Install an asphalt roll surface with polymer bituminous flashing on a low pitched but not flat roof.
It has just one layer so it goes.